.jpg)
PORTALJABAR, BANDUNG CITY - In order to accelerate the construction of the Nurtanio Flyover which connects Jalan Dr. Abdul Rachman Saleh and Jalan LMU Nurtanio (Garuda), the erection girder (main beam of the bridge) will be installed.
To support the smooth and safe running of the work, several roads around the project area will be temporarily closed from 15-25 October 2025 at 20.00 WIB - 05.00 WIB
During this period, the public is asked to avoid the project area and use the alternative routes that have been prepared.
During the construction, traffic will be diverted. From Jalan Pajajaran, traffic can be diverted via Jalan Samiaji, Arjuna, Bima, Rama, and Jalan Aruna.
Meanwhile, from Jalan Rajawali Barat, you can go straight to Jalan Rajawali Timur.
This closure is implemented at night to minimize traffic disruptions. Therefore, the public can adjust their travel times and routes accordingly.
This construction work is a crucial part of the Nurtanio Flyover project, which will improve mobility in the northern Bandung area. (Bandung City Communications and Information Office/UPI)